Present: Marge, Phong, Liz, Mihael, TomL, TomJ
Absent: Bob
Common
Need to get the ELabs report draft sections by next week
Need to be in by Wednesday, 23 Jun
Need to set a license for the ELabs software package
Not GPL
Need to get rid of GPL'ed code.
Cosmic
A lot of errors have been occurring
Perfect storm of errors (www17 SSH unresponsive, people hitting the system with big loads, etc) caused the system to stop processing jobs last Thursday
SSH provider library is buggy as hell
Concurrency is a pain in the rear
Database table corruption last Friday blocked Cosmic logins; symptoms resolved and investigating the issue
Large shower studies can bring the system to its knees
CMS
Marge & Liz sent out a to-do list (see attachment)
Event display: TomL having trouble with the detector model
Pretest/posttest - needs to be looked at?
Many small updates?
LIGO
Super-Bluestone beta1 operational on www12 and undergoing user testing in a workshop